1. Design-Construction Handover 设计施工交接
Designers and the construction team conduct special handover, clarifying the details of construction drawings, process standards and key node requirements, and transferring technical disclosure documents simultaneously to ensure the accurate implementation of design intentions.

设计师与施工团队开展专项交接,明确施工图纸细节、工艺标准及关键节点要求,同步移交技术交底文件,确保设计意图准确落地。


2. Site Clearing 场地清理
Complete on-site cleaning of the construction area, carry out standardized demolition and removal of old facilities and obstacles that need to be dismantled, ensuring the construction site is tidy and free from safety hazards.

完成施工区域现场清理,对需拆砸的旧有设施、障碍物进行规范拆除与清运,保障施工场地整洁、无安全隐患。


3. Site Leveling 场地平整
According to the requirements of vertical design, we will carry out earthwork leveling and compaction treatment on the site to ensure that the site elevation meets the design standards and lays a foundation for subsequent construction.

根据竖向设计要求,对场地进行土方找平、压实处理,确保场地的标高符合设计标准,为后续施工奠定基础。


4. Full Courtyard Setting Out 全院放线
We will use professional measuring instruments to complete the full courtyard setting out according to the master plan layout drawing, clarifying the position boundaries of core areas such as structures, paving and pipelines to ensure construction accuracy.

使用专用测量仪器,按总平面放样定位图完成全院放线,明确构筑物、铺装、管线等核心区域的位置边界,确保施工准确度。


5. Pipeline Embedding 预设管线
We will embed water supply, drainage and circuit pipelines according to the water and electricity design drawings, and take pipeline marking and protection measures to ensure the pipeline layout is compliant and free of leakage hazards.

按水电设计图纸,预埋给排水、电路管线,做好管线标识与防护措施,保障管线布局合规、无渗漏隐患。


6. Formwork and Concrete Construction for Structures and Water Features 构筑物水景支模及混凝土施工
We will complete formwork erection and steel bar binding according to detailed structural drawings and water feature design requirements, and use compliant concrete for pouring to ensure the structures and water features are stable in structure and up to standard in shape.

按构筑详图与水景设计要求,完成模板搭建、钢筋绑扎,采用合规混凝土进行浇筑,确保构筑物与水景结构稳固、形态达标。


7. Hard Paving Construction 硬质铺装施工
We will carry out ground hard paving operations in accordance with civil engineering design drawings, strictly controlling the splicing accuracy, flatness and joint treatment of paving materials to ensure the paving effect is consistent with the design.

依据土建设计图,开展地面硬质铺装作业,严格把控铺装材料拼接精度、平整度及缝隙处理,确保铺装效果与设计一致。


8. Finished Paving Protection 铺装成品保护
Immediately after the completion of hard paving construction, we will cover the surface of finished products with professional protective materials to avoid scratches and pollution caused by subsequent construction, ensuring the integrity of the paving.

硬质铺装施工完成后,立即采用保护材料覆盖成品表面,避免后续施工造成划伤、污染,保障铺装完好性。


9. Woodwork and Ironwork Installation 木作与铁艺安装
We will process and manufacture woodwork and ironwork components according to design drawings, carry out accurate on-site installation and fixation, and conduct anti-corrosion and anti-rust treatment to ensure the components are firm, durable and meet style requirements.

按设计图纸加工制作木作、铁艺构件,现场准确安装固定,做好防腐、防锈处理,确保构件牢固耐用且符合风格要求。


10. Lighting Installation 灯具安装
We will install courtyard lighting fixtures according to the circuit layout drawing, adjust the brightness and angle of the lights to ensure the fixture positions are accurate, the circuits are safe and the lighting effect meets the standards.

依据电路布置图,安装庭院照明灯具,调试灯光亮度与角度,确保灯具位置正确、线路安全、照明效果达标。


11. Project Completion 工程收尾
Complete garbage removal and site cleaning in the construction area, optimize details (such as joint filling and surface wiping) , and prepare for the final acceptance inspection.
完成施工区域垃圾清运、场地清洁,对细节部位(如缝隙填补、表面擦拭)进行优化处理,为竣工验收做好准备。